Regulator/Spillway gates at Chute-Allard Power Plant – COH and Hydro-Québec

Looking for solutions?

Contact us
Location La Tuque, Quebec, Canada
Year of realization 2008 - 2009
Project value USD 20 Million

DESCRIPTION

Central Chute-Allard is a hydroelectric power plant and a dam built on the Saint-Maurice River by Hydro-Quebec, near Wemotaci in the administrative region of Mauricie, Quebec. This plant, with an installed capacity of 62 MW, and Rapides-des-Coeurs, located downstream, was commissioned in 2008. The construction was completed in 2009. 

PROGESYS offered services for design and supervision activities, regarding the spillway/regulator gates, the embedded parts, the hydraulic hoist and the support structure.  

SERVICES OFFERED

  • Provided design and calculations 
  • Provided detailed engineering and drawings 
  • Redacted fabrication and installation procedures 
  • Supervised fabrication and installation.