Regulator / Spillway gates at Chute-Allard Power Plant

Looking for solutions?

Contact us
Location La Tuque, Quebec, Canada
Year of realization 2008-2009
Project value USD 20 Million

DESCRIPTION

Central Chute-Allard is a hydroelectric power plant and a dam built on the Saint-Maurice River by Hydro-Quebec, near Wemotaci in the administrative region of Mauricie, in Quebec . This plant, with an installed capacity of 62 MW and the Rapides-des-Coeurs plant, located downstream, were commissioned in 2008. Construction was completed in 2009.

A leading resource of Progesys offered its services for Design and Supervision activities, regarding Spillway/Regulator gates, embedded parts, Hydraulic Hoist and Support Structure.

SERVICES OFFERED

  • Design & Calculations
  • Detailed engineering and drawings
  • Redaction of fabrication and installation procedures
  • Supervision of fabrication and installation